from
Library of Dan Burisch
Work on re-linking the Eagles Disobey
website is continuing. Over the last year of the websites existence,
BJ experienced the loss of the data on more than one occasion due to
hard disk crashes and 'external tampering' As a result I have found a
few different websites, some were cached within google, others are to
be found at
Archive.org.
Instead of linking straight to the archived website, I thought a better idea
would be to setup links to each of the different websites below. I haven't
really looked at these different sites in detail, but each one appears
fairly similar but with additional information not held in the others.
Contents of zip file to download:
-
Eaglesdisobey - from June 03
-
Eaglesdisobey - from May 03
-
Eaglesdisobey - from April 2 03
-
Eaglesdisobey - from April 25 03
-
Eaglesdisobey - from Feb 03
-
Eaglesdisobey - from Oct 02
-
Eaglesdisobey - from Sept 02
-
March 10 04: Note I've not updated
default home links on all internal pages, so you will return to the
July 03 index page, unless you use the back browser. Also this is
still a work in progress, but I hope to be finished by the end of
next week.
To download full zip file "click"
HERE,
or see it in web-page format
HERE
from
The Mystery of Dr. Burisch
To:
MAJESTIC
12 / LOTUS PERSONNEL
CC: Deborah Burisch (CoDirector), “Binah” (Assistant Director, Data
Analysis)
From: Dr. Dan Burisch (Director)
Date: 01-09-2004
Please be advised that research relevant to the construction of the
theory and model has been completed. In fulfillment of the orders
provided (Blue Doc 04-07), final research data was
compiled, this morning (0000-0500) at the Frenchman Complex,
prior to the massive publicity/awareness surrounding a national “Lunar
Destination Speech.”
With authority as Director of Project Lotus (Staar-Flower),
I hereby issue the following instructions:
1. The
Remote Viewing
Unit is to be immediately closed. This decision is based, in part,
on security concerns.
2. Lotus Support Unit’s science and engineering
personnel are to immediately receive temporary reassignment orders,
as directed by the 12. (My heart and deep gratitude
goes out to each and every one of you for your hard work.)
3. By order of the 12, all corresponding
NatLabs are to be cut from the internal communications loop (Blue
Doc 04-91c).
4. Three Individuals from our community have been assigned to
the “Model Building Project - End Phase I”. Those individuals
have already received a personal card from me, in their Friday’s
envelope, with an image of a White Dove and a Number (1-3) on
it.
A.
Individual #1 is assigned as the “Bibliography Coordinator”.
B. Individual #2 is assigned as “Image Coordinator”
C. Individual #3 is assigned as “Proof Read/Copy
Coordinator”
All three individuals
are hereby instructed to be at my location, on the date and at the
time listed on the back of the Dove card. Your present assignment is
on hold until completion of the Lotus Model,
estimated, December, 2004. All three individuals are therefore
directed under my supervision until such date as they are released.
You are Deep Blue and your marital / child care status
has been taken into consideration. Your PIP doc
(to arrive shortly) will describe all arrangements necessary.
5. By order of the 12 (Blue Doc 04-92),
Staar Surveillance is ordered ceased, internal cameras
have been turned off.
6. By order of the 12 (Blue Doc 04-92a),
DIA/SRT “Team Blue” is ordered onsite. Personal
security detail will be derived from that unit.
7. As of January 01, 2004, all interrogatories were ceased,
by order of the 12 (Blue Doc 03-1077).
8. As of this date, January 09, 2004, I will receive no
community visitors. This prohibition is set until further notice.
9. All transport personnel are to be reassigned to liaison
NAFB, for dignitary conveyance.
10. Binah is hereby directed to compile/bundle data-sets and
report back to be no later than January 15, 2004.
11. By order of the 12, my participation
regarding Edward's “Sweet 16's Coral”, derived from
VMS, is placed into abeyance until the completion of
the Model (Blue Doc 04-204). You guy's can
enjoy the weather for a year down there!
12. All “RR’s” will be directed to new
assignments by the 12.
13. Supply personnel will continue onsite without change and
will receive instructions, within days, as to how communication flow
and supply requests will be made.
Personal Notes:
This is it, folks! Following T9, we can engage Phase
II, and begin transition toward Phase III,
Phase IV having been ordered completed by 2011. Should I
have not personally survived to that time, an Alternate
Director has already been personally selected by me and “she”
has been notified and accepted the position. Com/Assist by R’s (no
matter how personally valuable) is hereby directed- ceased. Thank you.
You guys are wonderful! In answer to many questions, I have placed
personal medical concerns into abeyance until after the model is
complete: the needs of the many apply.
May God grant us safe passage through this building process. I can only
hope that the upcoming public-cover “failure preparation announcement”
(as I like to call it) will bear fruit for an extended mission and leap
to the Red Earth, after a successful passage through
2012. I wonder how the timelines will collapse and how reality
will then look? Pyramids become mountains? Ha! Ha! If not, at least
Tebah-Genesis will be in a safe place for continuance of our
species, the soft light then shining on what’s left of earth,
providing some hope for the future. My thanks also to the Brits that
have come west to assist and observe, makes me feel at home in the
Prefect’s hut all over again!
Oh God, forgive me my transgressions and failings, and grant that the
project’s theory will fulfill the requirements placed upon us by those
in power. Grant guidance to those who make such decisions for us and
place upon them the mantle of your wisdom. O Lord, grant to those of us,
now embarking on this writing, clarity of thought, that we may
seek the Truth, no matter what it may be. Grant this to us, O
God of Creation, in the spirit of peace for ALL humanity!
Now, the order from this desk that you all have been waiting for, and
the title selected by me for this operation (I borrowed it from a movie
that touched me so deeply in the 1970īs):
We rig for
success for humanity! Rig for Op, “Silent Running”
Respectfully,
Dan Burisch
|